Construct a pipe network

We describe possible strategies to build, edit and develop a network in a step-wise fashion in a building with several storeys. You can deploy the operations for pipe networks with various media.

For the described actions, open a model of the discipline Sanitär/Heizung.

General procedure

To make the job effective, consider the space requirements of the system from the beginning. Work with the expected dimensions, and think about insulation as well as possible size changes using a network calculation.

ClosedMore

Special items in various networks

Specific characteristics must be considered for correct composition for the network with various media.

ClosedMore

Remember to use insulation!

The pipework for the PWH Hotwater and PWH-C Circulation media must be completely insulated

DDS‑CAD checks the temperature of the PWH Hotwater medium and the environmental temperature which is predominant in the space. The insulation used determines the resulting temperature loss and influences the size of the pump. The rule is: the better the insulation, the smaller the circulating pump.

The insulation materials used are shown in the parts list and are displayed in the model using their thickness. This allows you to visualize the space needs for pipework.

No bypasses

The system cannot be calculated if there is a bypass in the pipe network.

Correctly connect the circulation

Move the PWH-C Circulation medium in such a way that the end meets a hot water line. The connection must be done in such a way that the PWH Hotwater medium flows through the T junction with no change in direction.

Correctly build the ring network

The pipework calculations include consideration of ring line systems. Always use an object from the Manifold group as the starting and end points for a ring line.

Bind the point of use over a double-wall disk. Use the Automatic Connection function for this.

Important!

Only connect direct consumers (e.g. Water Tap) to the ring line. Devices for hot water production do not belong to a ring line

Design pipeline

The construction of a pipe network is divided into three phases:
At the start you decide on the technical parameters and the direction of the first segment. Next, you define the course and eventually terminate the pipe. For each phase you can choose an appropriate operation depending on the situation.

ClosedMore

Insert fitting

Fittings and components are always inserted into an existing pipe system afterwards.

ClosedMore

Edit pipe system

You have many options to edit a pipe system afterwards.

Important!

If you shift a riser, then check the risers on the neighbouring storeys. The connected risers for all floors must stand superimposed over one another on all storeys after the operation is completed.

Operations and help functions for building a network

Various help functions support the construction of a pipe system. Take advantage of these functions when required.

ClosedMore

Configure presentation

Use the options in the View menu for situation-appropriate presentation of the pipe network.